Skip to content

Upgrade sir-trevor to 0.6.6 #1816

Upgrade sir-trevor to 0.6.6

Upgrade sir-trevor to 0.6.6 #1816

Triggered via pull request October 18, 2024 16:50
Status Failure
Total duration 8m 38s
Artifacts 1

ruby.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
build
buildx failed with: ERROR: failed to solve: process "/bin/sh -c SKIP_TRANSLATION=yes DB_ADAPTER=nulldb DATABASE_URL='postgresql://fake' bundle exec rake assets:precompile" did not complete successfully: exit code: 1
test (ruby 3.3 / rails ~> 7.2 / blacklight ~> 8.0 Blacklight 8)
Process completed with exit code 1.
test (ruby 3.3 / rails ~> 7.2 / blacklight ~> 7.34 )
The job was canceled because "_7_2_3_3____8_0____4_0_Bl" failed.
test (ruby 3.3 / rails ~> 7.2 / blacklight ~> 7.34 )
The operation was canceled.
test (ruby 3.2 / rails 7.1.4 / blacklight ~> 7.34 Rails 7.1)
The job was canceled because "_7_2_3_3____8_0____4_0_Bl" failed.
test (ruby 3.2 / rails 7.1.4 / blacklight ~> 7.34 Rails 7.1)
The operation was canceled.
test (ruby 3.2 / rails ~> 7.2 / blacklight ~> 7.34 )
The job was canceled because "_7_2_3_3____8_0____4_0_Bl" failed.
test (ruby 3.2 / rails ~> 7.2 / blacklight ~> 7.34 )
The operation was canceled.
test (ruby 3.3 / rails ~> 7.2 / blacklight ~> 7.34 Bootstrap 5)
The job was canceled because "_7_2_3_3____8_0____4_0_Bl" failed.
test (ruby 3.3 / rails ~> 7.2 / blacklight ~> 7.34 Bootstrap 5)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
projectblacklight~spotlight~RM2Y28.dockerbuild
44.1 KB